Log in

Downloads

Outputs of the research theme 3.3 Technology & Grid

Outputs of the research theme 3.4 Environment & Society

Outputs of the research theme 3.6 Cost-Benefit Analysis

PreFeasibility Case Studies

Report "Towards a Baltic Offshore Grid: Connecting electricity markets through offshore wind farms" analysing two PreFeasibility Case Studies of the Baltic InteGrid project - Interconnecters and OWE farms between Poland-Sweden-Lithuania and Germany-Sweden

Recommendations to the Ten Year Network Development Plan (TYNDP)

Summary of the Baltic InteGrid consortium's recommendations submitted to the public consultation of the ENTSO-E’s Ten Year Network Development Plan 2018 (TYND2018)

Recommendations for the Maritime Spatial Planning Process

The Baltic InteGrid Recommendations for the Maritime Spatial Planning Process, focussing on the three fields of policy & regulatory framework, spatial management and information sharing.

First Results Conference (16 May 2017, Riga)

Documentation of the First Results Conference "Towards a Meshed Grid: Offshore Wind Energy and Interconnectors in the Baltic Sea Region" of the Baltic InteGrid project in Riga (Latvia) on 16 May 2017

BOGF Key Event: PreFeasibility Studies Conference Presentations (7 June 2018, Warsaw)