Outputs of the research theme 3.3 Technology & Grid

PreFeasibility Case Studies

Report "Towards a Baltic Offshore Grid: Connecting electricity markets through offshore wind farms" analysing two PreFeasibility Case Studies of the Baltic InteGrid project - Interconnecters and OWE farms between Poland-Sweden-Lithuania and Germany-Sweden

Recommendations to the Ten Year Network Development Plan (TYNDP)

Summary of the Baltic InteGrid consortium's recommendations submitted to the public consultation of the ENTSO-E’s Ten Year Network Development Plan 2018 (TYND2018)

First Results Conference (16 May 2017, Riga)

Documentation of the First Results Conference "Towards a Meshed Grid: Offshore Wind Energy and Interconnectors in the Baltic Sea Region" of the Baltic InteGrid project in Riga (Latvia) on 16 May 2017

BOGF Key Event: PreFeasibility Studies Conference Presentations (7 June 2018, Warsaw)